Sign In | Join Free | My ecer.co.uk
China Shandong Tengfei Hoisting Engineering Co., Ltd. logo
Shandong Tengfei Hoisting Engineering Co., Ltd.
Shandong Tengfei Hoisting Engineering Co., Ltd.
Verified Supplier

1 Years

Home > 300T Crawler Crane >

Used Xcmg Crawler Crane 300 Ton For Loading Unloading Precast Concrete Parts And Steel

Shandong Tengfei Hoisting Engineering Co., Ltd.
Trust Seal
Verified Supplier
Credit Check
Supplier Assessment
Contact Now

Used Xcmg Crawler Crane 300 Ton For Loading Unloading Precast Concrete Parts And Steel

Brand Name : XCMG

Model Number : XGC 300t

Place of Origin : China

MOQ : One Crane

Price : Negotiable Price

Payment Terms : L/C,T/T

Supply Ability : Supply According to Customer Needs

Delivery Time : According to Order Confirmation

Packaging Details : Packing According to Customer Requirements

Max. Lifting Height : 120m

Model : XGC300

Maximum Lifting Capacity : 300 tons

Ground Pressure : 0.12 MPa

Maximum Travel Speed : 1.5 km/h

Counterweight : 90 tons

Boom Length : 18-96m

Crawler Length : 10.5 m

Max. Lifting Moment : 3000 t·m

Maximum Tip Height : 152 m

Engine Power : 242 kW

Main Winch Line Pull : 300 kN

Contact Now

XGC 300t(-I)Crawler Crane Technical Specifications


Crawler crane models: XGC 300t(-I)
Max rated lifting capacity: 300t
Maximum lifting moment: 1865t.m

Tower working condition_no main boom pulley block and tower boom single pulley HW/1_85°_115t+40t_55m tower boom main hook performance

Main boom length(m)

55

HW/1

Tower arm length(m)

Radians

24

30

36

42

48

54

◇60

☆66

(m)

t

t

t

t

t

t

t

t

15

76.5

16

73.5

17

69.8

64.0

18

69.0

63.2

54.1

19

62.8

60.6

53.5

20

62.5

57.9

53.0

46.0

22

57.3

53.0

49.2

45.0

37.7

24

52.8

51.0

45.5

42.0

37.1

31.8

27.0

26

47.7

46.2

42.7

37.9

35.0

31.1

26.5

22.6

28

42.6

41.8

40.2

35.3

32.5

29.4

25.6

22.2

30

38.2

37.7

36.7

35.1

30.5

27.5

24.8

21.8

32

34.0

33.4

32.2

29.2

25.5

23.2

20.7

34

30.7

30.4

29.5

28.3

24.7

21.4

19.4

36

27.7

27.0

26.1

23.8

20.8

18.0

38

25.1

24.7

24.1

22.8

20.0

17.2

40

22.8

22.6

22.2

21.2

19.6

16.7

42

20.7

20.4

19.6

18.6

16.1

44

18.9

18.7

18.1

17.3

15.8

46

17.2

17.1

16.6

16.0

15.0

48

15.8

15.4

14.8

14.0

50

14.4

14.1

13.6

12.9

52

13.2

13.0

12.6

11.9

54

11.9

11.5

11.1

56

10.9

10.6

10.1

58

9.9

9.7

9.3

60

8.9

8.5

64

7.0

68

5.7

Notes:

1.◇--Tower-arm combination requires a 2.59m waist rope; ☆--Tower-arm combination requires a 3.58m waist rope.

2. The main boom section needs to remove the rear pull plate that fixes the auxiliary boom, and the main boom reducer needs to install the tower arm guide pulley.

3. When raising the boom, please place the crawler drive wheel behind the vehicle body, and it is recommended to use an auxiliary crane or inclined wedge to assist in raising the boom.

Tower type working condition_no main boom pulley block and tower boom single pulley HW/1_85°_115t+40t_67m tower boom main hook performance

Main boom length(m)

67

HW/1

Tower arm length(m)

Radians

24

30

36

42

48

54

◇60

☆66

(m)

t

t

t

t

t

t

t

t

16

57.0

17

55.7

18

54.2

49.0

19

52.8

48.0

43.0

20

52.3

46.5

42.0

22

47.5

45.0

39.0

36.0

32.0

24

44.9

40.1

38.8

33.7

30.5

27.2

26

40.6

38.9

34.1

32.8

29.2

26.0

22.7

28

36.6

35.4

34.0

29.5

27.8

24.8

21.8

19.0

30

33.2

32.2

31.1

29.0

25.8

23.6

20.6

18.1

32

29.2

28.5

27.2

24.7

22.2

20.5

17.1

34

26.6

26.0

25.1

23.8

20.8

18.6

16.2

36

24.2

23.7

23.0

22.1

20.8

18.1

15.1

38

21.7

21.1

20.4

19.3

17.6

15.5

40

19.8

19.3

18.7

17.9

16.8

14.6

42

18.0

17.7

17.2

16.5

15.6

14.5

44

16.2

15.8

15.2

14.4

13.5

46

14.8

14.5

14.0

13.3

12.5

48

13.6

13.3

12.8

12.2

11.5

50

12.2

11.7

11.3

10.6

52

11.2

10.8

10.4

9.7

54

9.9

9.5

9.0

56

9.1

8.7

8.2

58

8.2

7.9

7.4

60

7.2

6.8

64

5.9

5.5

68

4.1

Notes:

1.◇--Tower-arm combination requires a 2.59m waist rope; ☆--Tower-arm combination requires a 3.58m waist rope.

2. The main boom section needs to remove the rear pull plate that fixes the auxiliary boom, and the main boom reducer needs to install the tower arm guide pulley.

3. When raising the boom, please place the crawler drive wheel behind the vehicle body, and it is recommended to use an auxiliary crane or inclined wedge to assist in raising the boom.


Product Tags:

xcmg crawler crane 300 ton

      

Loading xcmg crawler crane 300t

      

Unloading xcmg crawler crane 300t

      
Quality Used Xcmg Crawler Crane 300 Ton For Loading Unloading Precast Concrete Parts And Steel for sale

Used Xcmg Crawler Crane 300 Ton For Loading Unloading Precast Concrete Parts And Steel Images

Inquiry Cart 0
Send your message to this supplier
 
*From:
*To: Shandong Tengfei Hoisting Engineering Co., Ltd.
*Subject:
*Message:
Characters Remaining: (0/3000)