Sign In | Join Free | My ecer.co.uk
China Shandong Tengfei Hoisting Engineering Co., Ltd. logo
Shandong Tengfei Hoisting Engineering Co., Ltd.
Shandong Tengfei Hoisting Engineering Co., Ltd.
Verified Supplier

1 Years

Home > 300T Crawler Crane >

Heavy Used 300t Crawler Crane For Large Bridges

Shandong Tengfei Hoisting Engineering Co., Ltd.
Trust Seal
Verified Supplier
Credit Check
Supplier Assessment
Contact Now

Heavy Used 300t Crawler Crane For Large Bridges

Brand Name : XCMG

Model Number : XGC 300t

Place of Origin : China

MOQ : One Crane

Price : Negotiable Price

Payment Terms : L/C,T/T

Supply Ability : Supply According to Customer Needs

Delivery Time : According to Order Confirmation

Packaging Details : Packing According to Customer Requirements

Max Gradeability : 30%

Crawler Length : 10.5 m

Track Shoe Width : 1.5 meters

Counterweight : 90 tons

Maximum Tip Height : 152 m

Slewing Speed : 0-2.5 rpm

Hoist Speed : 0-120 m/min

Boom Length : 18-102 meters

Maximum Line Speed : 120 m/min

Max Travel Speed : 1.2 km/h

Engine Power : 242 kW

Fuel Tank Capacity : 800 liters

Max Ground Pressure : 0.14 MPa

Maximum Travel Speed : 1.5 km/h

Contact Now

XGC 300t(-I)Crawler Crane Technical Specifications


Crawler crane models: XGC 300t(-I)
Max rated lifting capacity: 300t
Maximum lifting moment: 1865t.m

Fixed jib working condition_ Characteristics of jib main hook without main jib pulley block and single jib pulley (HF/1)

Working range of the jib main hook without main jib pulley block and jib single pulley (HF/1)

Heavy Used 300t Crawler Crane For Large Bridges

Working range of the jib main hook without main jib pulley block and jib single pulley (HF/1)

Performance of jib main hook with fixed jib working condition_no main jib pulley block and single jib pulley (HF7/1_10°_115t+40t)

Fixed Jib

7m

HF7/1

Main boom length(m)

Radians

34

40

43

46

49

55

61

67

70

73

79*

82*

85*

(m)

t

t

t

t

t

t

t

t

t

t

t

t

t

9

130.0

130.0

129.0

10

129.0

129.0

128.0

127.0

123.3

112.3

11

128.3

125.7

124.4

123.6

121.2

110.6

98.0

90.0

12

124.3

122.0

120.9

120.4

119.3

108.7

96.2

89.3

81.7

76.6

72.5

13

119.9

116.8

115.4

114.0

112.6

106.8

95.2

88.9

79.6

75.9

72.3

69.4

56.2

14

110.4

107.6

106.4

105.2

103.9

101.6

94.0

88.5

78.6

75.0

72.0

68.4

55.8

16

95.1

92.8

91.8

90.7

89.6

87.5

85.6

81.9

77.2

74.5

71.7

67.4

54.8

18

82.9

81.2

80.3

79.3

78.4

76.6

74.8

73.2

72.0

69.9

66.4

64.3

53.8

20

71.5

71.2

71.1

70.2

69.4

67.8

66.2

64.9

64.0

63.0

60.7

57.1

52.8

22

62.5

62.2

62.0

61.9

61.7

60.5

59.1

58.0

57.2

56.5

54.6

53.7

51.9

24

55.2

54.9

54.7

54.5

54.3

53.9

53.1

52.1

51.3

50.7

49.3

48.5

47.7

26

49.3

49.0

48.9

48.6

48.5

48.0

47.6

47.1

46.3

45.7

44.6

43.9

43.2

28

44.3

43.9

43.8

43.6

43.4

43.0

42.5

42.3

42.0

41.5

40.6

39.9

39.3

30

40.1

39.7

39.6

39.4

39.2

38.8

38.3

38.0

37.8

37.5

37.0

36.3

35.7

32

36.4

36.1

35.9

35.6

35.4

35.0

34.6

34.3

34.0

33.8

33.3

33.0

32.6

34

33.2

32.9

32.8

32.6

32.4

31.9

31.4

31.1

30.8

30.6

30.1

29.9

29.6

36

30.3

30.1

30.0

29.7

29.5

29.1

28.6

28.3

28.1

27.8

27.4

27.1

26.9

38

27.9

27.7

27.6

27.3

27.1

26.6

26.1

25.8

25.5

25.2

24.8

24.5

24.3

40

25.3

25.2

25.0

24.8

24.4

23.9

23.6

23.3

23.1

22.6

22.4

22.1

42

23.3

23.3

23.1

22.9

22.5

22.0

21.6

21.3

21.1

20.6

20.3

20.1

44

21.5

21.4

21.2

21.0

20.6

20.1

19.8

19.6

19.3

18.9

18.6

18.3

46

19.8

19.6

19.4

19.0

18.6

18.3

18.0

17.7

17.3

16.9

16.7

48

18.1

18.0

17.6

17.1

16.7

16.4

16.2

15.8

15.5

15.1

52

15.2

14.9

14.4

14.1

13.8

13.6

13.1

12.9

12.6

56

12.7

12.1

11.8

11.6

11.3

10.9

10.6

10.3

60

10.3

10.0

9.7

9.5

9.0

8.8

8.5

64

8.4

8.1

7.9

7.4

7.0

6.8

68

6.6

6.3

5.9

5.6

5.4

72

4.9

4.5

4.3

4.0

76

3.4

3.1

2.9

Notes:

1. “*” indicates that the main boom assembly needs to use a 1.31m waist rope.

2. The tower arm rear pull plate needs to be removed from each boom section, and the tower arm guide pulley needs to be removed from the main boom reducer section.

3. When raising the boom, please place the crawler drive wheel behind the vehicle body. If the main boom length exceeds 73m, use an auxiliary crane or inclined wedge to assist in raising the boom.


Product Tags:

Used 300 ton crawler crane

      

Large Bridges 300t Crawler Crane

      
Quality Heavy Used 300t Crawler Crane For Large Bridges for sale

Heavy Used 300t Crawler Crane For Large Bridges Images

Inquiry Cart 0
Send your message to this supplier
 
*From:
*To: Shandong Tengfei Hoisting Engineering Co., Ltd.
*Subject:
*Message:
Characters Remaining: (0/3000)