Sign In | Join Free | My ecer.co.uk
China Shandong Tengfei Hoisting Engineering Co., Ltd. logo
Shandong Tengfei Hoisting Engineering Co., Ltd.
Shandong Tengfei Hoisting Engineering Co., Ltd.
Verified Supplier

1 Years

Home > 500T Crawler Crane >

500T Crawler Crane Main Boom 60m For Wind Farm Equipment Installation

Shandong Tengfei Hoisting Engineering Co., Ltd.
Trust Seal
Verified Supplier
Credit Check
Supplier Assessment
Contact Now

500T Crawler Crane Main Boom 60m For Wind Farm Equipment Installation

Brand Name : ZOOMLION

Model Number : ZCC5800

Place of Origin : China

MOQ : One Crane

Price : Negotiable Price

Payment Terms : L/C,T/T

Supply Ability : Supply According to Customer Needs

Delivery Time : According to Order Confirmation

Packaging Details : Packing According to Customer Requirements

Maximum Lifting Speed : 120m/min

Maximum Travel Speed : 1.5km/h

Maximum Lifting Height : 108m

Maximum Gradeability : 30%

Boom Length : 18-96m

Maximum Lifting Capacity : 500 tons

Fuel Tank Capacity : 600L

Jib Length : 12-36m

Model : XGC500

Maximum Wind Speed For Operation : 12m/s

Maximum Lifting Radius : 100m

Engine Power : 298kW

Contact Now

500T Crawler Crane For Wind Farm Equipment Installation

ZCC5800 Crawler Crane Rated Lifting Capacity Manual


Chapter 5 Luffing Jib Working Conditions

Main boom 54m Rear weight 160t Vehicle weight 40t 360° Full slewing Main boom elevation angle 85°

Radians (m)

Jib length(m)

Radians (m)

24

30

36

42

48

54

60

66

72

16

118

16

18

106

102

18

20

95.4

91.9

88.8

86.3

20

22

86.8

83.6

80.7

78.4

75.7

22

24

79.5

76.6

73.8

71.9

69.3

67.3

24

26

73.3

70.5

68

66.3

63.9

62.1

59.7

58

26

28

67.8

65.4

62.9

61.3

59

57.5

55.1

53.6

51.5

28

30

61.8

60.8

58.5

57

54.8

53.3

51.2

49.7

47.7

30

32

56.3

54.6

53.2

51.1

49.7

47.6

46.2

44.3

32

34

51.8

51.1

49.7

47.7

46.4

44.4

43.1

41.2

34

36

47.8

47.4

46.7

44.8

43.5

41.6

40.3

38.5

36

38

44

43.9

42

40.9

39

37.8

36

38

40

40.9

40.8

39.6

38.4

36.6

35.5

33.8

40

44

35.7

35

34.2

32.5

31.5

29.8

44

48

31.3

30.7

30.4

29

28

26.4

48

52

27.1

26.9

26

25

23.5

52

56

23.9

23.1

22.5

21

56

60

20.5

20.2

18.8

60

64

18.2

17.9

16.8

64

68

15.9

15.1

68

72

13.4

72

76

500T Crawler Crane Main Boom 60m For Wind Farm Equipment Installation

11.8

76

Main boom 60m Rear weight 160t Vehicle weight 40t 360° Full slewing Main boom elevation angle 85°

Radians (m)

Jib length(m)

Radians (m)

24

30

36

42

48

54

60

66

72

16

114

16

18

101

97.9

18

20

91.8

88.5

85.3

20

22

83.6

80.6

77.7

75.5

72.8

22

24

76.6

73.8

71.1

69.3

66.7

64.8

24

26

70.7

68.1

65.6

63.9

61.4

59.7

57.3

26

28

65.6

63.1

60.8

59.2

56.8

55.3

53.1

51.5

49.4

28

30

61.1

58.7

56.5

55

52.8

51.4

49.2

47.7

45.7

30

32

54.8

52.7

51.3

49.2

47.9

45.8

44.4

42.4

32

34

51.4

49.3

48

46

44.7

42.7

41.4

39.5

34

36

47.6

46.3

45

43.1

41.9

40

38.8

36.9

36

38

43.6

42.4

40.6

39.4

37.5

36.3

34.6

38

40

40.6

39.9

38.2

37

35.2

34.1

32.4

40

44

35.4

34

33

31.3

30.2

28.6

44

48

31

30.4

29.6

27.9

26.9

25.3

48

52

26.9

26.6

25

24

22.5

52

56

23.7

22.5

21.5

20.1

56

60

21

20.3

19.4

17.9

60

64

18

17.4

16

64

68

15.7

14.3

68

72

13.9

12.8

72

76

500T Crawler Crane Main Boom 60m For Wind Farm Equipment Installation

11.4

76

Main boom 30m Rear weight 160t Vehicle weight 40t 360° Full slewing Main boom elevation angle 75°

Radians(m)

Jib length(m)

Radians (m)

24

30

36

42

48

54

60

66

72

22

88.7

22

24

79

24

26

71

70.2

26

28

64.3

63.5

62.6

28

30

58.7

57.9

57.1

56.7

30

32

53.7

53.1

52.3

51.9

32

34

49.2

48.9

48.1

47.8

46.9

34

36

45.2

44.5

44.2

43.3

42.8

36

38

41.9

41.3

41

40.1

39.7

38.7

38

40

38.4

38.1

37.3

36.8

35.8

35.3

40

44

33.4

33.3

32.4

32

31.1

30.6

29.6

44

48

29.2

28.5

28.1

27.1

26.7

25.7

48

52

25.1

24.8

23.9

23.4

22.5

52

56

22.2

22

21.1

20.6

19.7

56

60

19.5

18.6

18.2

17.3

60

64

16.5

16.1

15.3

64

68

14.6

14.3

13.4

68

72

12.6

11.8

72

76

10.3

76

80

500T Crawler Crane Main Boom 60m For Wind Farm Equipment Installation

9

80

Main boom 36m Rear weight 160t Vehicle weight 40t 360° Full slewing Main boom elevation angle 75°

Radians (m)

Jib length(m)

Radians(m)

24

30

36

42

48

54

60

66

72

24

77.3

24

26

69.5

26

28

63

62

28

30

57.4

56.6

55.6

30

32

52.6

51.9

50.9

50.5

32

34

48.4

47.8

46.9

46.5

45.5

34

36

44.2

43.3

43

42

36

38

40.9

40.2

39.9

38.9

38.4

38

40

38

37.4

37.1

36.1

35.7

34.6

40

44

32.5

32.3

31.4

31

30

29.5

28.2

44

48

28.4

27.5

27.1

26.2

25.7

24.7

48

52

25

24.3

23.9

23

22.5

21.5

52

56

21.5

21.2

20.2

19.8

18.8

56

60

18.8

17.9

17.4

16.5

60

64

16.6

15.8

15.4

14.5

64

68

14

13.6

12.7

68

72

12

11.2

72

76

10.5

9.7

76

80

500T Crawler Crane Main Boom 60m For Wind Farm Equipment Installation

8.4

80


Product Tags:

500t hydraulic crawler crane

      

60m 500t crawler crane

      

60m hydraulic crawler crane

      
Quality 500T Crawler Crane Main Boom 60m For Wind Farm Equipment Installation for sale

500T Crawler Crane Main Boom 60m For Wind Farm Equipment Installation Images

Inquiry Cart 0
Send your message to this supplier
 
*From:
*To: Shandong Tengfei Hoisting Engineering Co., Ltd.
*Subject:
*Message:
Characters Remaining: (0/3000)